“Preventive Maintenance Scheduling With Age Replacement Method at CNG Station ”. Aptisi Transactions on Technopreneurship (ATT), vol. 4, no. 2, July 2022, pp. 153-6, https://doi.org/10.34306/att.v4i2.260.